+ Case Study
Covanta

+ Solutions for
Covanta
As part of a heavy maintenance schedule, Dublin Waste to Energy (Covanta Plant) required four 5” bulk transfer hose assemblies to be replaced on the semi-dryer reactor.
Four replacement bulk transfer hoses on the semi-dryer reactor
Required PN16 swivel flanges for the transfer of lime
Completed on time and with minimal disruption to production



The Challenge
Hose Doctor was tasked to supply and install 4 x 10metre bulk material transfer assemblies, complete with PN16 swivel flanges for the transfer of lime.
The Solution
The project was completed within the specified time frame laid out by the client, resulting in minimum disruption to production.
Hose Doctor has the capability to supply and install a wide range of industrial hose assemblies to suit your business needs.
Have an emergency? It’s easy…
+353 1 419 0675
Guaranteed to be on site within 60 minutes of your hydraulic breakdown emergency!
