+ Case Study

Irish Rail

+ Solutions for

Irish Rail

 

The Irish Rail ICR Project Team were installing 3 x Stage V emissions compliant powerpacks on the Class 22000 Intercity Railcar fleet. These powerpacks will comply with the most up to date emissions compliance standards for railway vehicles.

Installation of 3 x Stage V emission compliant powerpacks

Modification of the vehicle underframe to support the installation

Completed on time and with minimal disruption to production

The Challenge

Hose Doctor was tasked to modify the vehicle underframe to support the installation of these powerpacks. The air pipes modification included the re-routing, removal, supply and introduction of air pipes on the vehicle underframe.

The Solution

The project was completed within the specified time frame laid out by the client, resulting in minimum disruption to production.

Hose Doctor has the capability to supply, bend and install mild steel, stainless steel and copper metric tubing from 6mm to 38mm

Have an emergency? It’s easy…

+353 1 419 0675

Guaranteed to be on site within 60 minutes of your hydraulic breakdown emergency!